Home chevron_rightNewsroom chevron_rightNews archive chevron_rightStandardkessel Baumgarte Service GmbH secures order for the modification of the waste heat steam generator on the gas turbine in Werk GENDORF Industrial Park chevron_right

Standardkessel Baumgarte Service GmbH secures order for the modification of the waste heat steam generator on the gas turbine in Werk GENDORF Industrial Park

December 2015

In late 2015 Standardkessel Baumgarte Service GmbH secured the order from InfraServ Gendorf for the modification of the existing waste heat steam generator. The aim is to meet the demands made on changed basic operating conditions due to the replacement of the existing gas turbine by a new one proceeding in parallel. The gas turbine and the dual pressure boiler modified and modernized by SBS are to ensure the supply of process steam and electrical energy to the industrial park for the next 15 years. 

 

 

Boiler output: max. 120 t/h 

HP steam pressure: 70 bar 

HP steam temperature: 510 °C 

LP steam pressure: 15 bar

You are looking for current information from the field of plant engineering and energy generation? Would you like to find out about upcoming exhibitions and other dates?

You can also get more news via our social media channels:

Standardkessel Baumgarte on LinkedIn
Standardkessel Baumgarte on Xing